B.C. Reg. 182/2014
M321/2014
Deposited October 3, 2014
This consolidation is current to December 9, 2025.

Utilities Commission Act

Energy Supply Contracts Exemption Regulation

Definition

1   In this regulation, "Act" means the Utilities Commission Act.

Exemption

2   The authority is exempt from section 71 of the Act in respect of an energy supply contract with a company listed in column 1 of the table below, and the successors and assigns of each of those companies, for the purchase of electricity generated by the company's project listed in column 2 of the table at the location listed in column 3 of the table, if the total generator nameplate capacity of the project does not exceed 15 MW:

Column 1
Company Name
Column 2
Project Name
Column 3
Project Location
Houweling Nurseries Ltd.Houweling Nurseries (Delta) Cogeneration2776 64th Street, Delta BC V4L 2N7
Quesnel River Pulp, A Division of West Fraser Mills Ltd.Quesnel River Pulp High Efficiency Cogeneration1000 Finning Road, Quesnel, BC V2J 6A1
Conifex MacKenzie Forest Products Inc.Conifex Mackenzie – Combined Heat and Power ProjectFFI Road, Mackenzie, BC V0J 2C0

[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, section 22]