"Point in Time" Regulation Content

Energy Resource Activities Act

Direction No. 1 to the British Columbia Energy Regulator

B.C. Reg. 1/2015

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Title September 1, 2023
Section 1 September 1, 2023
Section 2 September 1, 2023
Section 3 September 1, 2023

 Regulation title BEFORE re-enacted by BC Reg 187/2023, effective September 1, 2023.

Direction No. 1 to the Oil and Gas Commission

 Section 1 definition of "Act" BEFORE amended by BC Reg 187/2023, effective September 1, 2023.

"Act" means the Oil and Gas Activities Act;

 Section 2 BEFORE amended by BC Reg 187/2023, effective September 1, 2023.

Direction

2   This direction is issued to the regulator under sections 25 (1.1) and 95 (2) of the Act.

 Section 3 BEFORE amended by BC Reg 187/2023, effective September 1, 2023.

Permit for conversion may not be issued

3   The regulator may not issue a permit to a person to convert an LNG facility pipeline into a pipeline for transporting oil or diluted bitumen.