| Copyright © King's Printer, Victoria, British Columbia, Canada | Licence Disclaimer |
| B.C. Reg. 204/2019 M317/2019 | Deposited September 24, 2019 |
1 In this regulation:
"Act" means the Utilities Commission Act;
"quA-ymn" means quA-ymn Solar Limited Partnership, and its successors and assigns, owners of the solar generation facility described in section 2.
2 The authority and quA-ymn are exempt from section 71 of the Act in respect of an energy supply contract that establishes the terms and conditions under which electricity generated at a solar generation facility with a plant capacity output that does not exceed 15 megawatts, located on the Highland Valley Copper Mine site, is sold to the authority.
[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, s. 22.]