Section 4 (2) (b) BEFORE amended by BC Reg 67/2020, effective March 26, 2020.
(b) has, on the date this section comes into force, authorized under an enactment listed in that regulation for the purposes of this subsection.
Section 11 definition of "another power plant" BEFORE amended by BC Reg 237/2025, effective December 15, 2025.
"another power plant" means a project for the generation of electricity from the sun, the wind or the movement of tidal water, and includes all associated structures, machinery, appliances, fixtures, equipment and storage and handling facilities;
Section 12, Table 7, item 1, column 2, (1) (c) BEFORE amended by BC Reg 237/2025, effective December 15, 2025.
(c) another power plant, not including a power plant referred to in subsections (2) to (5).
Section 12, Table 7, item 1, column 2, (2) BEFORE repealed by BC Reg 237/2025, effective December 15, 2025.
(2) A new project that is a land-based wind generating facility with 15 or more turbines.
Section 13 table 9 columns 2 and 3 in criteria (2) (a) (ii) opposite category 4 in column 1 BEFORE amended by BC Reg 32/2023, effective February 10, 2023.
|
|
| |||||||||||||||||||||||||||||||||||||||
Section 14, Table 10, item 1, column 2, (3) (c) (part) BEFORE amended by BC Reg 187/2023, effective September 1, 2023.
(c) discharge to an underground formation, in accordance with the Oil and Gas Activities Act, of
Section 14, Table 10, item 1, column 3, (2) (c) (part) BEFORE amended by BC Reg 187/2023, effective September 1, 2023.
(c) discharge to an underground formation, in accordance with the Oil and Gas Activities Act, of