Schedule, section 6 (3) (a) and (b) BEFORE amended by BC Reg 141/2025, effective August 1, 2025.
(a) work related to gutters, fascia or metal studs;
(b) work related to the installation of siding, roofing or appliance air supply, breeching or venting systems;
Schedule, section 10 (0.1) was added by BC Reg 141/2025, effective August 1, 2025.
Schedule, section 10 (2) (c) BEFORE amended by BC Reg 141/2025, effective August 1, 2025.
(c) work on residential humidifying and air exchange systems.
Schedule, section 10 (2) (d) was added by BC Reg 141/2025, effective August 1, 2025.