"Point in Time" Regulation Content

Utilities Commission Act

Direction to the British Columbia Utilities Commission Respecting Industrial Electrification

B.C. Reg. 295/2020

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Section 3 July 8, 2024
Appendix 1 July 8, 2024
Appendix 2 July 8, 2024

 Section 3 (1) BEFORE repealed by BC Reg 200/2024, effective July 8, 2024.

(1) Within 10 days after receiving an application from the authority to do so, the commission must set as rates the rate schedules that are attached to this direction as Appendix 1 and Appendix 2.

 Section 3 (1.1) was added by BC Reg 200/2024, effective July 8, 2024.

 Section 3 (2) BEFORE amended by BC Reg 200/2024, effective July 8, 2024.

(2) Except on application by the authority, the commission must not cancel, suspend or amend a rate set under subsection (1).

 Appendix 1 BEFORE re-enacted by BC Reg 200/2024, effective July 8, 2024.

Appendix 1

 Appendix 2 BEFORE re-enacted by BC Reg 200/2024, effective July 8, 2024.

Appendix 2