Section 2 BEFORE amended by BC Reg 221/2014, effective November 26, 2014.
Reserve established
2 A mineral reserve for all minerals and placer minerals is established over each parcel or tract of land identified by a site number and name set out in Column 1 of the Table, within the mining division and land district set out in Column 2 of the Table opposite the site number and name.
[en. B.C. Reg. 6/2011, s. 3.]
Sites "Howe Sound", "Illecillewaet Hydro Project", "Beaton Creek Water Power Project" and "Kellie Creek Water Power Project" were cancelled by BC Reg 267/2012, effective September 12, 2012.
Sites "Pat Creek", "Soards Creek", "Kirbyville Creek", "Hugh Allan Creek", "Lower Gold River", "Upper Gold River", "Palmer Creek", "Bachelor Creek", "Spinster Creek" and "Anderson River" were cancelled by BC Reg 11/2013, effective January 28, 2013.
Site "KSM Mitchell-Teigen Tunnel" BEFORE amended by BC Reg 221/2014, effective November 26, 2014.
1006042 | KSM Mitchell-Teigen Tunnel | Skeena Mining Division Cassiar Land District | Tunnel Alignment Project | established by 298/2012 |
Sites "1002362 Europa Creek Hydro Project" and "1003465 Upper Pitt River Water Power Transmission Line" were cancelled by BC Reg 259/2016, effective November 1, 2016.
Site "1006747 Quartz Creek Bridge and Highway Project" was established by BC Reg 117/2019, effective June 4, 2019.
Site "1006748 Atlin Hydroelectric Expansion Project" was established by BC Reg 126/2019, effective June 17, 2019.
Site "1006869 West Fraser Road Realignment" was established by BC Reg 111/2020, effective May 27, 2020.