Regulation BEFORE repealed by BC Reg 157/2012, effective June 25, 2012.
B.C. Reg. 35/2012 O.C. 131/2012 | Deposited March 8, 2012 |
Forest Act
Master Licence to Cut Regulation
Prescribed purpose
2 Constructing or operating a pipeline under the National Energy Board Act (Canada) is a prescribed purpose for the purposes of section 47.4 (2) (b) (ii) of the Act.
[Provisions relevant to the enactment of this regulation: Forest Act, R.S.B.C. 1996, c. 157, section 151]