Regulation BEFORE repealed by BC Reg 137/2004, effective April 1, 2004.
| B.C. Reg. 418/95 O.C. 1221/95 | Deposited September 29, 1995 effective November 1, 1995 |
Power Engineers and Boiler and Pressure Vessel Safety Act
Boiler and Pressure Vessel Fees
and Expenses Regulation
Interpretation
1 In this regulation:
"ASME" means the American Society of Mechanical Engineers;
"audit" has the same meaning as defined in the code;
"code" means the ASME Boiler and Pressure Vessel Code as amended from time to time;
"normal working hours" means the hours between 8:00 a.m. and 4:30 p.m. Monday to Friday inclusive, excluding statutory holidays;
"overtime inspection" means an inspection outside normal working hours if the person requesting it has submitted the request in writing to the director, has indicated acceptance of overtime charges and has received the prior approval of the director to the overtime;
"survey" has the same meaning as defined in the code;
"vessel" means a boiler, pressure vessel, pressure piping system, fitting, plant or refrigeration equipment.
Payment of fees
2 (1) Unless otherwise specified in this regulation, fees under the Power Engineers and Boiler and Pressure Vessel Safety Act are due on the date specified in the invoice and must be paid by the owner of the vessel or the person being examined for certification, as the case may be.
(2) If the fee is not received by the branch within 30 days after its due date, the director may, without a hearing, suspend the debtor's licence, permit or certificate to which the fee relates.
Hourly rates
3 The hourly rates set out in Schedule A apply to
(a) re-inspections under section 6 of the Act,
(b) installation or alteration inspections,
(c) an inspection of the construction of a pressure containment component including the preparation by an inspecting power engineer of documents required to comply with the code or to comply with a request by the manufacturer or owner of the component,
(d) welding layout and field activities,
(e) surveys,
(f) audits,
(g) an inspection for which no other fee is provided,
(h) a disconnection, reconnection, lockout and removal of a lockout when they are required as a result of a suspension of a licence, permit or certificate, and the fee must be paid before the reconnection,
(i) final inspection of a new or relocated unit prior to being placed in service, and
(j) preparation and issuance of ad hoc reports.
[am. B.C. Reg. 316/97, s. 1.]
Overtime inspections
4 The fee for an overtime inspection, payable by the owner or contractor who requested the overtime, is the normal fee prescribed for the inspection plus an amount equal to the hourly rate times the hours of overtime.
Design inspection
5 The fee for a design inspection under section 14 of the Act,
(a) if the design specifications of the vessel are submitted to the director in sufficient detail, including supporting calculations, to enable the director to verify materials, design, construction and installation for compliance with applicable standards, is set out in Schedule B,
(b) if the design specifications are not submitted in accordance with paragraph (a), is the hourly rate set out in Schedule A, and
(c) if pressure welding procedures are submitted, is the fee under paragraph (a) or (b), plus the fee set out in Schedule I for ASME Welding Procedure Registration for each procedure specified in the code, except for welding layout and field activities, for which the hourly rates in Schedule A apply.
[am. B.C. Regs. 303/96, s. 1; 316/97, s. 2.]
Vessel construction inspection
6 The fee for a vessel construction inspection under section 4 of the Act is set out in Schedule C.
Installation or alteration inspection
7 The fee for an installation or alteration inspection under section 4 of the Act is set out in Schedule A.
Installation or alteration permit
8 The fee for an installation or alteration permit under section 14 of the Act is set out in Schedule D and is payable by the owner or contractor at the time of application for the permit.
Boilers — annual fees
9 (1) If a boiler inspection is not a design, construction, installation or alteration inspection and is scheduled by the director to take place once every 3 years, the fee for the inspection under section 4 of the Act is a total of 3 annual payments.
(2) Each payment under subsection (1) is in the amount set out in Schedule E, payable as follows:
(a) the first payment is due after successful completion of the installation inspection and the commencement of boiler operation;
(b) subsequent annual payments are due on the anniversary date of the commencement of boiler operation.
Digesters — annual fee
10 The fee for an inspection of a digester, if the inspection is scheduled by the director to take place once every 2 years, is the total of 2 annual payments each of which is payable on the anniversary date of the first installation inspection and each of which is in the amount set out in Schedule F.
Pressure vessels — annual fee
11 (1) In this section:
"regular service pressure vessel" is one to which subsection (2) (a) applies;
"designated service pressure vessel" is one to which subsection (2) (b) applies;
"special service pressure vessel" is one to which subsection (2) (c) applies.
(2) In the case of a pressure vessel that is not referred to in subsection (4) (d) or (e), the director may, from time to time, determine whether the pressure vessel requires inspections
(a) approximately once every 5 years,
(b) approximately once every 3 years, or
(c) approximately once every 2 years.
(3) In making a determination under subsection (2) the director must consider the condition of the pressure vessel, its load cycling frequency, the environment in which it operates, the likelihood of its corrosion or physical damage and any other factor that reasonably relates to the safe operating life of the pressure vessel.
(4) The fee payable for a pressure vessel inspection under section 4 of the Act, if the inspection is not a design, construction, installation or alteration inspection or an inspection under section 8 or 9, and if the pressure vessel is
(a) a regular service pressure vessel, is payable in annual installments in the amount set out in Schedule G-1,
(b) a designated service pressure vessel, is payable in annual installments in the amount set out in Schedule G-2,
(c) a special service pressure vessel, is payable in annual installments in the amount set out in Schedule G-3,
(d) an LPG service pressure vessel, is payable in annual installments in the amount set out in Schedule G-4,
(e) a dryer roll, is the amount set out in Schedule G-5, and
(f) a refrigeration plant, is the amount set out in Schedule G-6.
Contractor fees
12 The fee for a licence or renewal of licence for a contractor referred to in section 14 (1) (d) (i) of the Act, or for the registration or renewal of registration of a person referred to in section 14 (1) (d) (ii) of the Act, is set out in Schedule J.
[en. B.C. Reg. 316/97, s. 3.]
Evaluation, examination and certificate fees
13 The fees for evaluation of credentials, examinations and the issuance of interim or final certificates of competency are set out in Schedule H for all classes or categories of certificates.
[en. B.C. Reg. 11/2002, App. 2, s. 1.]
Fees for tests and renewals for pressure welders and registration for welding procedures
13.1 The fees for tests and renewals for pressure welders and registration for welding procedures are set out in Schedule I.
[en. B.C. Reg. 11/2002, App. 2, s. 2.]
Ad hoc report
14 The fee for the issuance of an ad hoc report is set out in Schedule A.
[en. B.C. Reg. 316/97, s. 4.]
Plant registration fees
15 The fees to register a plant are set out in Schedule K.
[en. B.C. Reg. 128/99, s. 1.]
[en. B.C. Reg. 382/98.]
Hourly Rates
(Sections 3, 5 (b) and (c), 7 and 14)
1 Normal working hours, inclusive except holidays, per hour.................................................... $82
2 Overtime working hours Saturdays and Sundays inclusive except holidays and Monday
to Friday inclusive, 4:30 p.m. to 8:00 a.m., per hour................................................................$123
3 Holiday working hours, per hour......................................................................................... $163
4 Preparation and issuance of an ad hoc report, for each hour or part of an hour....................... $93
[en. B.C. Reg. 382/98.]
Design Fees
(Section 5 (a) and (c))
1 Steel Boilers:
(a) with heating surface to 50 m2 inclusive................................................................ $88
(b) with heating surface more than 50 m2 to 200 m2 inclusive................................... $216
(c) with heating surface more than 200 m2 to 500 m2 inclusive................................. $434
(d) with heating surface more than 500 m2 to 1 000 m2 inclusive.............................. $537
(e) with heating surface more than 1 000 m2.......................................................... $537 plus
| $18 per 100 m2 of heating |
| surface over 1 000 m2 to a |
| maximum fee of $2 162. |
2 Cast Iron Boilers:
(a) each boiler design........................................................................................... $138
3 Pressure Vessels:
(a) with volume to 0.7 m3 inclusive.......................................................................... $60
(b) with volume more than 0.7 m3 to 2.8 m3 inclusive.............................................. $114
(c) with volume more than 2.8 m3 to 14.2 m3 inclusive............................................. $216
(d) with volume more than 14.2 m3 to 28.3 m3 inclusive .......................................... $319
(e) with volume more than 28.3 m3........................................................................ $434
4 Heat Exchangers:
(a) with heating surface to 10 m2 inclusive................................................................ $60
(b) with heating surface more than 10 m2 to 50 m2 inclusive..................................... $131
(c) with heating surface more than 50 m2 to 200 m2 inclusive................................... $260
(d) with heating surface more than 200 m2 to 500 m2 inclusive................................. $346
(e) with heating surface more than 500 m2............................................................ $346 plus
| $6 per 10 m2 of heating |
| surface over 500 m2 to a |
| maximum fee of $865. |
5 Pressure Piping Systems:
(a) pressure piping systems within the scope of ANSI/ASME Codes
B31.1 — Power Piping,
B31.3 — Chemical Plant and Petroleum Refinery Piping,
B31.5 — Refrigeration Piping.................................................................................. $260
(b) pressure piping systems within the scope of ANSI/ASME Code
B31.9 — Building Services Piping.................................................................................$31
(c) pressure piping systems within the scope of other approved Code Standards........ $260
(d) revisions to pressure piping systems - all categories...............Hourly rate as in Schedule A.
6 Refrigeration Plants:
(a) capacity of 125 kW prime mover nameplate rating or more and uses
Group 1 refrigerant.................................................................................................. $260
(b) capacity of 25 kW prime mover nameplate rating or more and uses
Group 2 or 3 refrigerants......................................................................................... $260
7 Registration of Fittings:
(a) single fitting......................................................................................................... $89
(b) a category of fittings........................................................................................... $239
8 Registration of Control Systems for Fired and Unfired Boilers:
(a) with heating surface to 200 m2 inclusive.................................................................. $89
(b) with heating surface more than 200 m2.................................................................. $205
9 The Design Fee Schedule outlined above relates to the submission of complete and acceptable design packages. For those packages which are incomplete, inaccurate, or otherwise involve further design survey input an interim charge based on the conventional charges above is applied. In addition the rework is charged out on an hourly rate basis as per Schedule A.
[en. B.C. Reg. 382/98.]
Vessel Construction Inspection Fees
(Section 6)
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
| OUTSIDE DIAMETER OF VESSEL | UP TO 3 m (UP TO 120") | OVER 3 m–6 m (OVER 120"–240") | OVER 6 m–9.1 m (OVER 240"–360") | OVER 9.1 m– 12.1 m (OVER 360"–480") | OVER 12.1 m– 15.2 m (OVER 480"–600") | OVER 15.2 m– 18.3 m (OVER 600"–720") | OVER 18.3 m– 21.3 m (OVER 720"–840") | OVER 21.3 m– 24.4 m (OVER 840"–960") | OVER 24.4 m– 27.4 m (OVER 960"– 1 080") | OVER 27.4 m (OVER 1 080") | |
| 0 | Up to 1 m (39") | $70 | $103 | $138 | $208 | $260 | $311 | $380 | $442 | $468 | $502 |
| 1 | Over 1 m–2 m (39"–78") | $131 | $191 | $260 | $311 | $380 | $434 | $468 | $502 | $519 | $554 |
| 2 | Over 2 m–3 m (78"–118") | $191 | $260 | $311 | $380 | $434 | $502 | $519 | $554 | $622 | $692 |
| 3 | Over 3 m–4 m (118"–158") | $260 | $311 | $380 | $449 | $519 | $554 | $622 | $692 | $745 | $814 |
| 4 | Over 4 m–5 m (158"–196") | $311 | $380 | $434 | $519 | $622 | $692 | $745 | $814 | $830 | $865 |
| 5 | Over 5 m (196") | $434 | $477 | $519 | $606 | $692 | $780 | $865 | $865 | $865 | $865 |
[en. B.C. Reg. 382/98.]
Installation Permit Fees
Alteration Permit Fees
(Section 8)
1 Boiler installation ............................................................................................................... $69
2 Boiler alteration ................................................................................................................. $69
3 Pressure vessel installation in refrigeration plant ................................................................... $69
4 Pressure vessel alteration in refrigeration plant ..................................................................... $69
5 Refrigeration plant installation ............................................................................................ $69
6 Refrigeration plant alteration .............................................................................................. $69
[en. B.C. Reg. 382/98.]
Operation Inspection Fees on Annual Basis
Boilers
(Section 9)
1 High Pressure Boilers, Low Pressure Boilers, Organic Fluid Boilers
(a) With a heating surface to 25 m2 inclusive or rated to 250 kW inclusive .................. $103
(b) With a heating surface more than 25 m2 to 50 m2 inclusive or rated more than
250 kW to 500 kW inclusive .................................................................................. $174
(c) With a heating surface more than 50 m2 to 100 m2 inclusive or rated more than
500 kW to 1 000 kW inclusive ............................................................................... $216
(d) With a heating surface more than 100 m2 to 500 m2 inclusive or rated more than
1 000 kW to 5 000 kW inclusive ............................................................................ $364
(e) With a heating surface more than 500 m2 to 1 000 m2 inclusive or rated more
than 5 000 kW to 10 000 kW inclusive ................................................................... $719
(f) With a heating surface more than 1 000 m2 to 2 000 m2 inclusive or rated more
than 10 000 kW to 20 000 kW inclusive ............................................................... $1 038
(g) With a heating surface more than 2 000 m2 or rated more than 20 000 kW ....... $1 038 plus
| $9 per 100 m2 of heating |
| surface over 2 000 m2 to a |
| maximum fee of $5 188 |
| or |
| $1 038 plus |
| $9 per 1 000 kW of rated |
| input over 20 000 kW to a |
| maximum fee of $5 188. |
2 Hot Water Boilers
(a) With a heating surface to 25 m2 inclusive ........................................................... $34
(b) With a heating surface more than 25 m2 to 50 m2 inclusive .................................. $60
(c) With a heating surface more than 50 m2 to 100 m2 inclusive ................................. $74
(d) With a heating surface more than 100 m2 to 500 m2 inclusive ............................. $123
(e) With a heating surface more than 500 m2 to 1 000 m2 inclusive ........................... $240
(f) With a heating surface more than 1 000 m2 to 2 000 m3 inclusive ........................ $346
(g) With a heating surface more than 2 000 m2 ...................................................... $346 plus
| $3 per 100 m2 of heating |
| surface over 2 000 m2 to a |
| maximum fee of $1 731. |
[en. B.C. Reg. 382/98.]
Digesters Annual Permit Fees
(Section 10)
Digesters
1 With shell volumetric measurement not more than 280 m3 .............................................. $299
2 With shell volumetric measurement more than 280 m3 ...................................................... $576
[en. B.C. Reg. 382/98.]
Annual Permit Fees
Pressure Vessels
Regular Service
(Section 11 (4) (a))
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
| OUTSIDE DIAMETER OF VESSEL | UP TO 3 m (UP TO 120") | OVER 3 m–6 m (OVER 120"–240") | OVER 6 m–9.1 m (OVER 240"–360") | OVER 9.1 m– 12.1 m (OVER 360"–480") | OVER 12.1 m– 15.2 m (OVER 480"–600") | OVER 15.2 m– 18.3 m (OVER 600"–720") | OVER 18.3 m– 21.3 m (OVER 720"–840") | OVER 21.3 m– 24.4 m (OVER 840"–960") | OVER 24.4 m– 27.4 m (OVER 960"–1 080") | OVER 27.4 m (OVER 1 080") | |
| 0 | Up to 1 m (39") | $14 | $19 | $28 | $40 | $47 | $57 | $70 | $79 | $87 | $91 |
| 1 | Over 1 m–2 m (39"–78") | $27 | $34 | $47 | $57 | $70 | $78 | $87 | $91 | $96 | $102 |
| 2 | Over 2 m–3 m (78"–118") | $34 | $47 | $57 | $70 | $78 | $91 | $96 | $102 | $114 | $126 |
| 3 | Over 3 m–4 m (118"–158") | $47 | $57 | $70 | $83 | $96 | $102 | $114 | $126 | $135 | $148 |
| 4 | Over 4 m–5 m (158"–196") | $57 | $70 | $78 | $96 | $114 | $126 | $135 | $148 | $152 | $160 |
| 5 | Over 5 m (196") | $78 | $88 | $96 | $111 | $126 | $143 | $160 | $160 | $160 | $160 |
[en. B.C. Reg. 382/98.]
Annual Permit Fees
Pressure Vessels
Designated Service
(Section 11 (4) (b))
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
| OUTSIDE DIAMETER OF VESSEL | UP TO 3 m (UP TO 120") | OVER 3 m–6 m (OVER 120"–240") | OVER 6 m–9.1 m (OVER 240"–360") | OVER 9.1 m– 12.1 m (OVER 360"–480") | OVER 12.1 m– 15.2 m (OVER 480"–600") | OVER 15.2 m– 18.3 m (OVER 600"–720") | OVER 18.3 m– 21.3 m (OVER 720"–840") | OVER 21.3 m– 24.4 m (OVER 840"–960") | OVER 24.4 m– 27.4 m (OVER 960"–1 080") | OVER 27.4 m (OVER 1 080") | |
| 0 | Up to 1 m (39") | $28 | $40 | $50 | $75 | $94 | $114 | $138 | $162 | $170 | $181 |
| 1 | Over 1 m–2 m (39"–78") | $47 | $70 | $94 | $114 | $138 | $161 | $170 | $181 | $190 | $202 |
| 2 | Over 2 m–3 m (78"–118") | $70 | $94 | $114 | $138 | $161 | $181 | $190 | $202 | $226 | $251 |
| 3 | Over 3 m–4 m (118"–158") | $94 | $114 | $138 | $166 | $190 | $202 | $226 | $251 | $271 | $295 |
| 4 | Over 4 m–5 m (158"–196") | $114 | $138 | $161 | $190 | $226 | $251 | $271 | $295 | $302 | $314 |
| 5 | Over 5 m (196") | $161 | $174 | $190 | $221 | $251 | $282 | $314 | $314 | $314 | $314 |
[en. B.C. Reg. 382/98.]
Annual Permit Fees
Pressure Vessels
Special Service
(Section 11 (4) (c))
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
| OUTSIDE DIAMETER OF VESSEL | UP TO 3 m (UP TO 120") | OVER 3 m–6 m (OVER 120"–240") | OVER 6 m–9.1 m (OVER 240"–360") | OVER 9.1 m– 12.1 m (OVER 360"–480") | OVER 12.1 m– 15.2 m (OVER 480"–600") | OVER 15.2 m– 18.3 m (OVER 600"–720") | OVER 18.3 m– 21.3 m (OVER 720"–840") | OVER 21.3 m– 24.4 m (OVER 840"–960") | OVER 24.4 m– 27.4 m (OVER 960"– 1 080") | OVER 27.4 m (OVER 1 080") | |
| 0 | Up to 1 m (39") | $34 | $54 | $70 | $103 | $131 | $157 | $191 | $223 | $235 | $251 |
| 1 | Over 1 m–2 m (39"–78") | $66 | $96 | $131 | $157 | $191 | $216 | $235 | $251 | $260 | $276 |
| 2 | Over 2 m–3 m (78"–118") | $96 | $131 | $138 | $191 | $216 | $251 | $260 | $276 | $311 | $346 |
| 3 | Over 3 m–4 m (118"–158") | $131 | $157 | $191 | $226 | $260 | $276 | $311 | $346 | $374 | $407 |
| 4 | Over 4 m–5 m (158"–196") | $157 | $191 | $216 | $260 | $311 | $346 | $374 | $407 | $415 | $434 |
| 5 | Over 5 m (196") | $216 | $239 | $260 | $304 | $346 | $389 | $434 | $434 | $434 | $434 |
[en. B.C. Reg. 382/98.]
Annual Permit Fees
Pressure Vessels
LPG Service
(Section 11 (4) (d))
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
| OUTSIDE DIAMETER OF VESSEL | UP TO 3 m (UP TO 120") | OVER 3 m–6 m (OVER 120"–240") | OVER 6 m–9.1 m (OVER 240"–360") | OVER 9.1 m– 12.1 m (OVER 360"–480") | OVER 12.1 m– 15.2 m (OVER 480"–600") | OVER 15.2 m– 18.3 m (OVER 600"–720") | OVER 18.3 m– 21.3 m (OVER 720"–840") | OVER 21.3 m– 24.4 m (OVER 840"–960") | OVER 24.4 m– 27.4 m (OVER 960"–1 080") | OVER 27.4 m (OVER 1 080") | |
| 0 | Up to 1 m (39") | $8 | $11 | $15 | $26 | $31 | $36 | $43 | $50 | $54 | $57 |
| 1 | Over 1 m–2 m (39"–78") | $14 | $23 | $31 | $36 | $43 | $48 | $54 | $57 | $60 | $63 |
| 2 | Over 2 m–3 m (78"–118") | $23 | $31 | $36 | $43 | $48 | $57 | $60 | $63 | $71 | $79 |
| 3 | Over 3 m–4 m (118"–158") | $31 | $36 | $43 | $52 | $60 | $63 | $71 | $79 | $84 | $93 |
| 4 | Over 4 m–5 m (158"–196") | $36 | $43 | $48 | $60 | $71 | $79 | $84 | $93 | $94 | $98 |
| 5 | Over 5 m (196") | $48 | $55 | $60 | $70 | $79 | $89 | $98 | $98 | $98 | $98 |
[en. B.C. Reg. 382/98.]
Inspection Fees
Dryer Rolls
(Section 11 (4) (e))
Dryer Rolls
1 Per roll, installed in dryer............................................................................................................... $19
2 Per spare roll, being a roll for which a valid annual permit is required prior to the roll
being placed in service.......................................................................................................................$19
[en. B.C. Reg. 382/98.]
Annual Permit Fees
Refrigeration Plants
(Section 11 (4) (f))
Refrigeration Plants
1 To a capacity of 125 kW prime mover nameplate rating using Group 1 refrigerants
inclusive ......................................................................................................................................... $57
2 More than 125 kW prime mover nameplate capacity rating using Group 1 refrigerants ......................... $88
3 To a capacity of 25 kW prime mover nameplate rating using Group 2 or 3 refrigerants
inclusive .......................................................................................................................................... $57
4 More than 25 kW prime mover nameplate capacity rating using Group 2 or 3 refrigerants .................... $88
[en. B.C. Reg. 382/98; am. B.C. Regs. 128/99, s. 2; 11/2002, App. 2, s. 3.]
Evaluation, Examination and Certificate Fees
(Section 13)
1 Evaluation of Credentials ........................................................................................................... $47
2 Administration and Invigilation of Examination for Certificate, for each paper .................................. $32
3 Granting of Certificate of Competency (Interprovincial Program and
Marine Engineer Certification)
| Power Engineers | — 1st Class ................................................................................................... $251 | |
| — 2nd Class .................................................................................................. $205 | ||
| — 3rd Class ................................................................................................... $149 | ||
| — 4th Class ................................................................................................... $102 | ||
| — 5th Class ..................................................................................................... $96 |
4 Issuing Duplicate Certificate of Competency — All Classes .......................................................... $94
Issuing Duplicate Wallet Card Certificate of Competency — All Classes ............................................... $8
5 Interim "A" Certificate of Competency — All Classes ................................................................. $158
Interim "B" Certificate of Competency — All Classes ....................................................................... $94
6 Limited Certificate of Competency — All Categories .................................................................... $79
7 Repealed. [B.C. Reg. 11/2002, App. 2, s. 3 (b).]
[en. B.C. Reg. 382/98; am. B.C. Reg. 11/2002, App. 2, s. 4.]
Fees for Tests and Renewals for Pressure Welders
and Registration for Welding Procedures
(Section 13.1)
1 Welder — First ASME qualification test ................................................................................... $79
2 Welder — ASME Test requalification or renewal ........................................................................ $63
3 ASME Welding Procedure Registration ................................................................................... $127
| plus the fee in Schedule A or B |
[en. B.C. Reg. 382/98.]
Licence or Registration Fees
Contractor or Owner
(Section 12)
1 Contractor — licence or renewal of licence ............................................................................. $83
2 Owner — registration or renewal of registration ..................................................................... $83
[en. B.C. Reg. 128/99, s. 3; am. B.C. Reg. 113/2002.]
Plant Registration Fees
(section 15)
1 Risk Assessed Plants:
(1) Registration of Risk Assessed Plant:
a) initial application fee and maximum of 5 hours'
documentation review.............................................................................................. $540
b) any additional documentation review ............................................................. hourly rate
(2) Safety audit inspection by Inspecting Power Engineer:
a) up to a maximum of 5 hours ................................................................................ $390
b) any additional hours at ................................................................................ hourly rate
(3) Bi-yearly safety audit:
a) up to a maximum of 5 hours ................................................................................ $390
b) any additional hours at ................................................................................ hourly rate
2 General Supervision Plants:
(1) Registration of General Supervision Plant:
a) initial application fee and maximum of 3 hours'
documentation review ............................................................................................. $384
b) any additional documentation review ............................................................ hourly rate
(2) Safety audit inspection by Inspecting Power Engineer:
a) up to a maximum of 3 hours ................................................................................ $234
b) any additional hours at ................................................................................ hourly rate
(3) Bi-yearly safety audit:
a) up to a maximum of 3 hours ............................................................................... $234
b) any additional hours at ................................................................................ hourly rate
3 Bi-yearly renewal, Certificate of Plant Registration ......................................................................... $166
Note: this regulation replaces B.C. Reg. 296/90.
[Provisions of the Power Engineers and Boiler and Pressure Vessel Safety Act, R.S.B.C. 1996, c. 368, relevant to the enactment of this regulation: section 35]