| Copyright © King's Printer, Victoria, British Columbia, Canada | Licence Disclaimer |
| B.C. Reg. 52/2025 British Columbia Utilities Commission | Deposited April 10, 2025 |
1 In this regulation:
"Act" means the Utilities Commission Act;
"KWA Station extension" means
(a) the upgrade and expansion of the Kwadacha Diesel Generating Station in the community of Kwadacha to increase the firm capacity by approximately 750 kilowatts, and
(b) related works and equipment, including works and equipment to enable the positioning of a spare generator;
"TKD Station extension" means
(a) the upgrade and expansion of the Tsay Keh Dene Diesel Generating Station in the community of Tsay Keh Dene to increase the firm capacity by approximately 1 200 kilowatts, and
(b) related works and equipment, including works and equipment to enable the positioning of a spare generator.
2 The KWA Station extension and the TKD Station extension are excluded from the operation of section 45 (1) of the Act.
[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, s. 45 (4).]
Copyright © King's Printer, Victoria, British Columbia, Canada