Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

"Point in Time" Regulation Content

Utilities Commission Act

Direction to the British Columbia Utilities Commission Respecting the Biomass Energy Program

B.C. Reg. 71/2019

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Section 5 March 13, 2026
Appendix 2 March 13, 2026

 Section 5 (1.1) was added by BC Reg 32/2026, effective March 13, 2026.

 Section 5 (2) BEFORE amended by BC Reg 32/2026, effective March 13, 2026.

(2) The commission may not cancel, suspend or amend the rate set under subsection (1), except on application by the authority.

 Appendix 2 was enacted by BC Reg 32/2026, effective March 13, 2026.