Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

"Point in Time" Regulation Content

Renewable Energy Projects (Streamlined Permitting) Act

Renewable Energy Projects (Streamlined Permitting) Regulation

B.C. Reg. 93/2025

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Part 1 December 15, 2025
Section 1 December 15, 2025
Part 2 December 15, 2025
Section 3 December 15, 2025
Section 3.1 December 15, 2025
Section 4 December 15, 2025
Section 4.1 December 15, 2025
Part 3 December 15, 2025
Section 6 December 15, 2025
Section 7 December 15, 2025

 Part 1 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 1 definitions of "high-output" and "land-based" were added by BC Reg 237/2025, effective December 15, 2025.

 Part 2 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 3 BEFORE re-enacted by BC Reg 237/2025, effective December 15, 2025.

Level 2 streamlining

3   The streamlined projects referred to in section 2 (c) and (d) are prescribed for the purposes of section 5 (b) [application of Division 2 — level 2 streamlining] of the Act.

 Section 3.1 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 4 BEFORE re-enacted by BC Reg 237/2025, effective December 15, 2025.

Application of Environmental Assessment Act

4   The streamlined project referred to in section 2 (d) is prescribed for the purposes of section 14 (d) [application of Environmental Assessment Act] of the Act.

 Section 4.1 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Part 3 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 6 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 7 was enacted by BC Reg 237/2025, effective December 15, 2025.