SECTIONEFFECTIVE DATE
Part 1 December 15, 2025
Section 1 December 15, 2025
July 10, 2026
Part 2 December 15, 2025
Section 2 July 10, 2026
Section 3 December 15, 2025
July 10, 2026
Section 3.1 December 15, 2025
Section 4 December 15, 2025
July 10, 2026
Section 4.1 December 15, 2025
Part 3 December 15, 2025
Section 6 December 15, 2025
Section 7 December 15, 2025

 Part 1 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 1 definitions of "high-output" and "land-based" were added by BC Reg 237/2025, effective December 15, 2025.

 Section 1 definition of "Nass Valley Transmission Line project" was added by BC Reg 122/2026, July 10, 2026.

 Part 2 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 2 (e) was added by BC Reg 122/2026, effective July 10, 2026.

 Section 3 BEFORE re-enacted by BC Reg 237/2025, effective December 15, 2025.

Level 2 streamlining

3   The streamlined projects referred to in section 2 (c) and (d) are prescribed for the purposes of section 5 (b) [application of Division 2 — level 2 streamlining] of the Act.

 Section 3 (e) was added by BC Reg 122/2026, effective July 10, 2026.

 Section 3.1 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 4 BEFORE re-enacted by BC Reg 237/2025, effective December 15, 2025.

Application of Environmental Assessment Act

4   The streamlined project referred to in section 2 (d) is prescribed for the purposes of section 14 (d) [application of Environmental Assessment Act] of the Act.

 Section 4 (2) BEFORE amended by BC Reg 122/2026, effective July 10, 2026.

(2) The North of Terrace Transmission Line project is prescribed for the purposes of section 14 (d) of the Act.

 Section 4.1 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Part 3 heading was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 6 was enacted by BC Reg 237/2025, effective December 15, 2025.

 Section 7 was enacted by BC Reg 237/2025, effective December 15, 2025.