B.C. Reg. 295/2020
O.C. 657/2020
Deposited December 21, 2020
This consolidation is current to December 9, 2025.
Link to consolidated regulation (PDF)
Link to Point in Time

Utilities Commission Act

Direction to the British Columbia
Utilities Commission Respecting
Industrial Electrification

[Last amended July 8, 2024 by B.C. Reg. 200/2024]

Application

1   This direction is issued to the commission under section 3 of the Utilities Commission Act.

Tariff Supplement No. 37

2   Within 10 days after receiving an application from the authority to do so, the commission must consent to the rescission of Tariff Supplement No. 37 — Northwest Transmission Line Supplemental Charge.

Rates

3   (1) Repealed. [B.C. Reg. 200/2024, s. 1.]

(1.1) Within 10 days after the date this subsection comes into force, the commission must issue an order, effective on the date the order is issued, setting as rates the rate schedules that are attached to this direction as Appendix 1 and Appendix 2.

(2) Except on application by the authority, the commission must not cancel, suspend or amend a rate set under subsection (1.1).

[am. B.C. Reg. 200/2024, s. 1.]

Appendix 1

[en. B.C. Reg. 200/2024, s. 2.]

Appendix 2

[en. B.C. Reg. 200/2024, s. 2.]

[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, s. 3.]