Division B
Acceptable Solutions

Part 5 — Environmental Separation

Section 5.8. Moisture in the Ground

change begin(See Appendix A and Part 10.)change end

5.8.1. Foundation and Floor Drainage

5.8.1.1. Required Drainage
1) Intent StatementExcept where a wall or floor is subject to continuous hydrostatic pressure, or unless it can be shown to be unnecessary, the bottom of every exterior foundation wall and every floor-on-ground shall be provided with drainage. (See Appendix A.)
5.8.1.2. Drainage Materials and Installation
1) Intent StatementDrainage shall be specified and installed to accommodate the drainage load.

5.8.2. Protection from Moisture in the Ground

(See Appendix A.)
5.8.2.1. Required Moisture Protection
(See Appendix A.)
1) change beginWherechange end a building element separates interior space from the ground, materials, components or assemblies shall be installed to prevent moisture transfer into the space.

contentHistory

2) change beginDeleted.change end

contentHistory

5.8.2.2. Protective Material and Component Properties
1) Intent StatementExcept where it can be shown that lesser protection will not lead to adverse conditions, or as provided in Article 5.8.2.3., materials and components installed to provide required moisture protection shall conform to the requirements of this Article.
2) Except as provided in Sentences (3) and (7), materials installed to provide the required moisture protection shall be capable of bridging
a) construction, control and expansion joints,
b) junctions between different building assemblies, and
c) junctions between building assemblies and elements penetrating building assemblies.

contentHistory

3) Except as provided in Sentence (7), where the material installed to provide the required moisture protection is not capable of bridging construction, control and expansion joints, those joints shall be designed to maintain the continuity of the moisture protection.

contentHistory

4) Intent StatementMaterials and components installed to provide the required moisture protection shall have sufficiently low water permeance to resist moisture loads.
5) Intent StatementExcept as provided in Sentence (7), moisture protection shall be designed and constructed to resist design hydrostatic pressures determined in accordance with Section 4.2.
6) Intent StatementExcept as provided in Sentence (7), materials covered in the scope of the standards listed below shall not be installed to provide the required resistance to moisture transfer:
7) Intent StatementWhere the substrate is cast-in-place concrete, and a drainage layer is installed between the building assembly and the soil, and the assembly will not be subject to hydrostatic pressure,
a) materials and components installed to provide the required resistance to moisture transfer need not conform to Sentences (2), (3), (5) and (6), and
b) materials covered in the scope of the following standards are permitted to be installed to provide the required resistance to moisture transfer where those materials conform to the requirements of the standards:
(See Appendix A.)
5.8.2.3. Installation of Moisture Protection
1) Intent StatementExcept as provided in Sentence (2), where materials are installed to provide the required resistance to moisture transfer and their installation is covered in the scope of the standards listed below, installation shall conform to the waterproofing requirements of the respective standards:
2) Intent StatementWhere the substrate is cast-in-place concrete, and a drainage layer is installed between the building assembly and the soil, and the assembly will not be subject to hydrostatic pressure
a) materials and components installed to provide the required resistance to moisture transfer and whose installation is covered in the scope of the standards listed in Sentence (1), are permitted to be installed in conformance with the dampproofing requirements of the standards listed in Sentence (1), or
b) materials installed to provide the required resistance to moisture transfer and whose installation is covered in the scope of the standards listed below, shall be installed in conformance with the requirements of the respective standards:
(See A-5.8.2.2.(7) in Appendix A.)