4.8.1. Scope

4.8.1.1. Application
1) Intent StatementThis Section applies to flammable liquid and combustible liquid installations on piers and wharves, but does not include marine fuel-dispensing stations.

4.8.2. General

4.8.2.1. Clearances
1) Intent StatementPiers and wharves where cargos of flammable liquids or combustible liquids are transferred in bulk quantities to or from tanks of marine vessels shall be not less than 30 m from
a) any bridge over a navigable waterway, and
b) an entrance to a superstructure of any vehicular or railroad tunnel under a waterway.
2) Intent StatementThe termination of fixed piping for loading and unloading flammable liquids or combustible liquids shall be not less than 60 m from a bridge or from an entrance to a tunnel.
4.8.2.2. Construction
1) Intent StatementThe substructure and deck of a pier or wharf shall be designed for its intended use and shall be constructed of heavy timber or material that will provide adequate flexibility, resistance to shock, durability, strength and fire resistance.

4.8.3. Storage Tanks

4.8.3.1. Installation
1) Intent StatementExcept as permitted in Sentences (2) and (3), storage tanks shall be installed on shore in conformance with Subsections 4.3.2. to 4.3.7.
2) Intent StatementStorage tanks are permitted to be located in buildings on piers and wharves of solid-fill or noncombustible construction provided they conform to Subsections 4.3.13. to 4.3.15.
3) Intent StatementStorage tanks are permitted to be buried in piers and wharves of the solid-fill type provided they conform to Subsections 4.3.8. to 4.3.12.

4.8.4. Piping, Valves and Fittings

4.8.4.1. Installation and Materials
1) Intent StatementThe method of installation and materials used for piping, valves and fittings shall conform to Section 4.5.
4.8.4.2. Pipe Supports
1) Intent StatementPiping shall be properly supported and arranged to prevent excessive vibration or strain on equipment connected to it.
2) Intent StatementPiping supports shall consist of
a) wood having no dimension less than 150 mm,
b) steel, or
c) concrete.
3) Intent StatementWhere pipe is supported more than 1.2 m above the pier deck, piping supports shall have a minimum fire-resistance rating of 2 h.
4.8.4.3. Guards
1) Intent StatementIn areas where general cargo is handled or where piping might be subject to physical damage from vehicles, watercraft or floatplanes, the piping shall be protected by means of guarding devices.
4.8.4.4. Flexible Connections
1) Intent StatementPiping between the shore and piers or wharves shall be provided with swing joints or flexible connections designed in conformance with good engineering practice to permit the independent movement of the pier or wharf and shore piping without strain on the pipe.
4.8.4.5. Shut-off Valves
1) Intent StatementA readily accessible valve to shut off the supply from shore shall be provided in each pipeline within 7.5 m of piers and wharves.
4.8.4.6. Access Openings for Inspection
1) Intent StatementAccess openings for inspection purposes below deck shall be provided for valves required in Article 4.8.4.5. and for connections to pipelines, and suitable signs shall be posted indicating their locations.
2) Intent StatementNo freight or materials shall be placed on piers and wharves in such a manner as to obstruct the access openings required in Sentence (1).
4.8.4.7. Identification
1) Intent StatementIdentification tags or labels of metal or other material impervious to water and to the flammable liquids or combustible liquids being transferred shall be attached to and maintained on all pipelines and control valves to designate their use.
4.8.4.8. Leakage Testing
1) Intent StatementPiping systems shall be tested for leakage in conformance with Section 4.4. before being put into service and before reactivation when used on a seasonal basis.
2) Intent StatementUnderground piping systems referred to in Sentence (1) shall be tested at intervals no greater than 12 months.

4.8.5. Bonding and Grounding

4.8.5.1. Bonding and Grounding
1) Intent StatementRailway tracks on piers and wharves shall be bonded throughout their length and permanently grounded in conformance with TC SOR/82-1015, “Railway Prevention of Electric Sparks Regulations.”
2) Intent StatementInsulating joints shall be placed in all rails where entering upon the pier or wharf.

4.8.6. Fire Protection

4.8.6.1. Portable Extinguishers
1) Intent StatementPortable extinguishers having a rating of 40-B:C shall be provided in the vicinity of Class I liquid pumps and fuel dispensers.
2) Intent StatementPortable extinguishers shall be kept in the pump house or other suitable location where they will be accessible in the event of an emergency, but not accessible to the public.
3) Intent StatementWhere marine vessels are loading or unloading flammable liquids or combustible liquids or are being refuelled, portable extinguishers with a rating of not less than 40-B:C shall be placed on the pier or wharf in the vicinity of loading or unloading operations so that they are accessible in the event of a fire emergency.
4) Intent StatementPortable extinguishers provided in conformance with Sentence (3) shall be in addition to those provided on board the marine vessels.
4.8.6.2. Training
1) Intent StatementOperating personnel shall be trained on how to summon the nearest fire department in the event of fire.

4.8.7. Bulk Transfer Stations

4.8.7.1. Location
1) Intent StatementExcept as permitted in Sentence (2), the bulk transfer of flammable liquids or combustible liquids shall be permitted only on piers and wharves used exclusively for that purpose.
2) Intent StatementWhere it is not practicable to locate bulk transfer stations on separate piers and wharves, such stations are permitted to be located on general purpose piers and wharves provided that guards or fences are installed around valves or pumping equipment to prevent entry of unauthorized personnel.
4.8.7.2. Leakage and Spill Control
1) Intent StatementMeasures to accommodate possible leakage or spillage from hose couplings shall be provided in conformance with Subsection 4.1.6.
2) Intent StatementProvision shall be made to prevent spillage resulting from the disconnection of hoses.
4.8.7.3. Hose Connections
1) Intent StatementExcept as provided in Sentence (2), hose connections on piping shall be of the bolted flange type, and all such connections shall be provided with shut-off valves.
2) Intent StatementThe use of cam-locking connections up to 100 mm in size shall be permitted.
3) Intent StatementHose connections shall not project beyond the face of piers and wharves.

4.8.8. Cargo Hose

4.8.8.1. Cargo Hose
1) Intent StatementThe transfer of flammable liquids or combustible liquids between tanks of marine vessels and piers or wharves shall be through
a) flexible cargo hose designed in conformance with good engineering practice (see Appendix A), or
b) jointed tubing or piping
i) suitable for the cargo to be transferred, and
ii) designed to withstand the maximum design working pressure.
4.8.8.2. Maintenance and Testing
1) Intent StatementCargo hose shall be maintained in satisfactory operating condition and be pressure tested, at intervals not greater than 12 months, to 1.5 times the maximum working pressure but not less than 350 kPa (gauge).
4.8.8.3. Supports
1) Intent StatementCargo hose shall be supported where it is not run on a solid foundation.

4.8.9. Cargo Pumps

4.8.9.1. Pressure Relief
1) Intent StatementCargo pumps capable of producing pressures in excess of the safe working pressure of the cargo hose shall be provided with pressure relief devices such as return lines or relief valves.
4.8.9.2. Location
1) Intent StatementExcept as permitted in Sentence (2), cargo pumps shall be located
a) on shore or on piers and wharves either of noncombustible construction or of the solid-fill type, and
b) not less than 3 m from other buildings or structures.
2) Intent StatementWhere it is not practicable to install cargo pumps as required in Sentence (1), they are permitted to be installed on piers and wharves of combustible construction if located in pump houses
a) conforming to Subsection 4.8.10., and
b) located not less than 3 m from other buildings.

4.8.10. Pump Houses

4.8.10.1. Construction
1) Intent StatementPump houses shall be of noncombustible construction with floors that are chemically resistant to the liquid being handled, liquid-tight and equipped with curbs or flashings around the base of the wall not less than 100 mm in height to contain any spilled liquid.

4.8.11. Transfer Operations

4.8.11.1. Supervision
1) Intent StatementTransfer operations shall be carried out only under the continuous supervision of a person qualified to supervise such operations.
2) Intent StatementCargo shall not be transferred to or from the tank of a marine vessel unless sufficient personnel are on board to control the operation.
3) Intent StatementThe person responsible for directing the operations shall
a) prior to the transfer of cargo, ascertain that no unauthorized repair work is being carried out on the pier or wharf and that there are no open flames in the vicinity,
b) during the transfer of cargo, monitor the progress of the loading and unloading to prevent overflow, and
c) inspect the hose and connections for leakage and, if leakage occurs, stop the operations.
4.8.11.2. Bonding and Grounding
1) Intent StatementTanks of marine vessels shall be electrically connected to the shore piping prior to the connection of cargo hose, except when cathodic protection facilities are operating.
2) Intent StatementElectrical connections to tanks of marine vessels shall be maintained until the cargo hose has been disconnected and any spillage has been removed.
4.8.11.3. Equipment
1) Intent StatementCargo hose shall be of adequate length to allow for movement of the marine vessel.
2) Intent StatementGaskets shall be used in all hose joints and pipe couplings to prevent leakage.
3) Intent StatementFlanged joints shall be tightly bolted to prevent leakage.
4) Intent StatementDrip pans shall be placed under hose connections on piers and wharves, except where a sump pit or settling basin is provided.
4.8.11.4. Spill Control
1) Intent StatementWhen transfer operations are completed,
a) the valves on the hose connections shall be closed, and
b) unless the cargo hose change beginis equipped with a device that automatically prevents liquid from draining from the hose upon its disconnection, the hose shall be drained so as not to create a fire or explosion hazard.change end
2) Intent StatementCare shall be taken that no liquid is discharged on a pier or wharf or overboard during draining and emptying operations.